Civil Infrastructure:
Building Connections & Communities

We build the backbone of modern living by delivering comprehensive engineering and, civil infrastructure solutions that connect communities, drive economic growth, and promote sustainable development.
- CES_SDC Pte. Ltd.
GRC is dedicated to creating the essential frameworks that enable thriving communities and sustainable urban growth. We specialise in the design-and-build of key civil infrastructure projects, including public and institutional buildings, MRT stations and tunnels, roads, and utilities system. Leveraging cutting-edge engineering practices and innovative construction technologies, we ensure every project meets the highest standards of safety, durability, and environmental stewardship.
Our subsidiary - CES_SDC possess the highest CW01 A1 grading in General Building and Civil Engineering, as well as the highest L6 grading in Electrical Engineering and Integrated Building Services from Building and Construction Authority which allows it to tender for public sector projects of unlimited contract value.
With a focus on smart city integration, we leverage green materials, value engineering, and intelligent monitoring systems that enhance infrastructure performance and longevity. Backed by a proven track record of timely delivery and cost-effective project management, GRC stands as a trusted partner in shaping the future of civil infrastructure.
Civil Infrastructure Projects

Contract P102 – Design & Construction of Elias Station and Tunnels for CRL-Punggol Extension
Client: Land Transport Authority
Description: Design and Construction of Elias Station and Tunnels for CRL-Punggol Extension comprising of one Retrieval Shaft, one Launch Shaft, Cut and Cover Tunnel and 1.4km Twin Bored Tunnel drive passing below several HDB Blocks, Sungei Api Api Bridge and under CR109 Tunnel
Completion: 2031 (expected)

Choa Chu Kang Waterworks - Contract 1 (Civil and External Sewer Works)
Client: Public Utilities Board
Description: Reconstruction of aging facilities in the Pre-treatment area and construction of new Post-treatment buildings and facilities.
Completion: 2028 (expected)

Tuas Water Reclamation Plant Contract C6A – Administrations and Operations Buildings
Client: Public Utilities Board
Description: Construction of administration buildings and guardhouse including interfaces between buildings and sitewide, industrial liquids modules, biosolids and greasy waste facilities and integrated waste management facilities, as well as operation and maintenance of facilities for one year after completion.
Completion: 2027 (expected)

Contract J107 – Gek Poh Station, Tawas Station and Viaduct for Jurong Region Line
Client: Land Transport Authority
Description: Design, construction and completion of two elevated stations JW1 and JW2, as well as two elevated MRT viaducts with a total length of 1.3km
Completion: 2026 (expected)

Tuas Water Reclamation Plant Contract 4A – Biosolids and Digesters
Client: Public Utilities Board
Description: Construction of biosolids building and digesters, supply and installation of biosolids treatment and biogas handling equipment, testing, and commissioning of facilities, as well as operation and maintenance of facilities for one year after completion
Completion: 2025 (expected)

Development of Changi East to Effect 3 Runway Operations at Singapore Changi Airport (Hock Lian Seng Infrastructure - CES_SDC JV)
Client: Changi Airport Group
Description: Construction of new pavement works and refurbishment of existing Runway 2, drainages, external mechanical & electrical works, as well as security fencing and ancillary buildings around Runway 2 including specialist airfield instruments works
Completion: 2024 (expected)

Contract T227 – Marina South Station & Tunnels for Thomson Line (SinoHydro - CES_SDC Joint Venture)
Client: Land Transport Authority
Description: Construction of Marina South Station comprising a three-level underground station with twin bored tunnels to Marina Bay Station as well as cut and cover tunnels to Gardens by the Bay Station (Depth of excavation is about 26m)
Completion: 2024 (expected)

Changi Water Reclamation Plant Phase 2 (Contract C22A – Foundation Works for Train 5)
Client: Public Utilities Board
Description: Construction of pile foundations, sheet piling, earth retaining and stabilisation structures (ERSS), soil stabilisation, bulk excavation and backfilling works
Completion: 2021

225M gas-fired combined cycle power facility in Myanmar (JEL – SDCIM Consortium)
Client: Sembcorp Myingyan Power Company Limited
Description: Engineering, procurement and construction of 225-megawatt gas-fired combined cycle power facility comprising two sets of GE 6F.03 gas turbine with generators, two HRSGs and one steam turbine with its generator, 2-storey administration & control building, cooling tower & ancillary buildings
Completion: 2019

MOE office at 51 Grange Road
Client: Ministry of Education
Description: Designed using Design for Manufacture and Assembly (DfMA) and Building Information Modelling (BIM), and constructed using Prefabricated Prefinished Volumetric Construction (PPVC)
Completion: 2016

NTUC My First Skool mega childcare centre 1 at Jurong West
Client: NTUC First Campus Co-Operative Ltd
Description: Designed using Design for Manufacture and Assembly (DfMA) and Building Information Modelling (BIM), and constructed using Prefabricated Prefinished Volumetric Construction (PPVC)
Completion: 2016

NTUC My First Skool mega childcare centre 2 at Fernvale Link
Client: NTUC First Campus Co-Operative Ltd
Description: Designed using Design for Manufacture and Assembly (DfMA) and Building Information Modelling (BIM), and constructed using Prefabricated Prefinished Volumetric Construction (PPVC)
Completion: 2016

JTC Aviation 2 @ Seletar Aerospace Park
Client: Jurong Town Corporation
Description: Design and construction of 10/11-storey commercial and light industrial building with one level of basement and a connecting bridge to JTC Aviation One
Completion: 2016

Singpost Regional eCommerce Logistics Hub
Client: Singpost Investments (Ecommerce Logistics) Pte Ltd
Description: Design and construction of a 4-storey logistic facility and warehouse and an 8-storey building consisting of warehouse, canteen and ancillary offices at Greenwich Drive/Tampines Road
Completion: 2016

Narrow body 2-bay aircraft hangar at Changi
Client: ST Aerospace Services Co Pte Ltd
Description: Design and construction of a hangar to house two narrow body planes such as B737 and A321; main hangar is designed with single volume
Completion: 2013

Sembcorp Woodchip Boiler Plant 1 & 2 at Jurong Island
Client: Sembcorp Cogen Pte Ltd
Description: Engineering, procurement & construction of civil & structural, architectural and building services works for Sembcorp’s first renewable energy plant that produces 60 tonnes per hour of steam from waste wood incineration
Completion: 2013

Integrated Wastewater Treatment Plant @ Banyan at Jurong Island
Client: Hitachi Plant Technologies Pte Ltd
Description: Engineering, procurement & construction of civil & structural, architectural and building services works for an industrial wastewater treatment plant that can treat multiple streams of complex industrial wastewater
Completion: 2012

Service corridor expansion pipelines at Jurong Island
Client: Sembcorp Industries Ltd
Description: Engineering, procurement & construction of civil & structural works including fencing and gates, pipe sleepers, pipe racks and pipe bridges, etc
Completion: 2012

Changi NEWater Plant
Client: Sembcorp NEWater Pte Ltd
Description: Engineering, procurement & construction of civil & structural, architectural and building services works for a NEWater plant that is capable of producing 228,000 cubic metres of NEWater per day
Completion: 2010
GRC Limited
12 Tai Seng Link #08-01
Singapore 534233